simpl.
自然资源合规 12 项

Pipeline Pigging & Inline Inspection (ILI) Checklist

此检查清单为英文版。

Verify launch/receive safety, tool run planning, and data validation for cleaning pigs and inline inspection tools used in pipeline integrity management programs.

49 CFR 195.45249 CFR 192.493API STD 1163NACE SP0102

免费 PDF 或 Word · 输入邮箱即可下载。

Line Preparation & Cleaning

  • Has line cleanliness been established with cleaning pig runs before the inline inspection tool is run? *
  • Have pipeline diameter changes, tight bends, and valve bore restrictions been verified to pass the selected tool? *
  • Is a gauging or geometry pig run performed to confirm passage before the ILI tool? *

Launcher & Receiver Safety

  • Is the pig trap depressurized, vented, and drained before the closure is opened? *
  • Is the pressure-relieving and interlock system on the trap closure verified operational? *
  • Are personnel positioned clear of the trap closure and end-cap discharge path during launch and receipt? *

Tool Run & Tracking

  • Was the ILI tool type (MFL, UT, geometry) selected appropriate to the anticipated threats (metal loss, cracking, dents)? *
  • Are above-ground markers and tracking used to confirm tool location and velocity during the run? *
  • Was flow velocity maintained within the tool's specified operating range? *

Data Validation & Integrity Action

  • Was the ILI data validated against known features and verified for adequate coverage and sensor performance? *
  • Were reported anomalies assessed against remaining-strength criteria to determine repair or reinspection response? *
  • Are dig verifications performed to confirm tool sizing accuracy where warranted? *

下载完整的Pipeline Pigging & Inline Inspection (ILI) Checklist检查清单

免费获取排版清晰、便于打印的 PDF,或可编辑的 Word 文档。