自然资源合规 12 项
Heap Leach Cyanide Management & Destruction Checklist
此检查清单为英文版。
Verify solution containment, cyanide destruction/detoxification, and closure controls for a gold or silver heap-leach operation using cyanide, consistent with the International Cyanide Management Code.
International Cyanide Management Code40 CFR 261ASTM D7237State Cyanide Regulations
免费 PDF 或 Word · 输入邮箱即可下载。
Containment & Solution Management
- Are leach pads, ponds, and process solution channels equipped with liners and leak-detection/collection systems to prevent release? *
- Is adequate freeboard and storm-event storage capacity maintained in solution ponds to prevent overtopping? *
- Are process solutions kept within the design operating range to avoid uncontrolled discharge? *
Cyanide Handling & Worker Safety
- Is cyanide unloaded, mixed, and stored using engineered systems that prevent HCN gas formation and worker exposure? *
- Is solution pH maintained sufficiently alkaline (protective alkalinity) to minimize HCN gas evolution? *
- Are HCN gas monitoring, cyanide antidote, and emergency response provisions available where cyanide is handled? *
Cyanide Destruction & Detoxification
- Is a cyanide destruction process (e.g., SO2/air, hydrogen peroxide, or INCO) applied to detoxify solutions and tailings before discharge or disposal? *
- Is weak-acid-dissociable (WAD) cyanide monitored to confirm it is reduced below the applicable discharge or storage threshold? *
- Record the WAD cyanide concentration of the treated solution (mg/L). *
Wildlife Protection & Closure
- Are open-water cyanide concentrations kept below 50 mg/L WAD or otherwise mitigated to protect wildlife and birds? *
- Is a heap and pond rinse/detoxification plan in place for closure to neutralize residual cyanide? *
- Are cyanide monitoring and destruction records retained to demonstrate compliance? *
下载完整的Heap Leach Cyanide Management & Destruction Checklist检查清单
免费获取排版清晰、便于打印的 PDF,或可编辑的 Word 文档。
