海事合规 13 项
Tugboat and Towing Operations Safety
此检查清单为英文版。
Assesses towing gear, girting prevention, and communications for tug and tow operations, covering connection, watchkeeping, and emergency release.
ISM CodeIMO Res. A.535COLREGs
免费 PDF 或 Word · 输入邮箱即可下载。
Towing Gear Inspection
- Are the towline, bridle, and connecting hardware inspected and within their certified safe working load? *
- Is the towing winch, hook, and its emergency (quick) release tested and functioning? *
- Are gob ropes, gog wires, or tow pins available and rigged to control the towline lead? *
- Enter the certified breaking load of the main towline in tonnes.
Girting and Capsize Prevention
- Is the crew briefed on girting (girding) risk and the actions to slip or release the tow immediately? *
- Are self-release or quick-release arrangements accessible to the tug operator at all times during towing? *
- Is the tug's stability and freeboard suitable for the towing forces expected in the operation? *
Communications and Watchkeeping
- Is reliable two-way communication established between the tug, the tow, and any controlling station? *
- Are the required towing lights and shapes displayed for the length of the tow? *
- Is a dedicated lookout and helm watch maintained throughout the towing operation? *
Emergency Preparedness
- Is a towing emergency plan available covering parting of the tow, girting, and personnel recovery? *
- Are personnel prohibited from standing in the bight or snap-back zone of working lines? *
- Is a means to recover a lost tow, such as a messenger or emergency towing pennant, available? *
下载完整的Tugboat and Towing Operations Safety检查清单
免费获取排版清晰、便于打印的 PDF,或可编辑的 Word 文档。
