海事合规 11 项
Mooring Operations Safety Inspection
此检查清单为英文版。
Reviews mooring equipment, line management, and safe practices during berthing and unberthing under SOLAS Chapter II-1 and industry guidance (MEG4).
SOLASMEG4
免费 PDF 或 Word · 输入邮箱即可下载。
Mooring Equipment Condition
- Are mooring lines within their retirement criteria and free from significant wear, cuts, or damage? *
- Are winches, drums, brakes, and their controls maintained and functioning correctly? *
- Have winch brake holding capacities been tested and recorded within the required interval? *
Fittings and Documentation
- Are bollards, fairleads, rollers, and chocks free from sharp edges, cracks, and excessive wear? *
- Is a Mooring System Management Plan (MSMP) and Line Management Plan available and followed? *
- Are Safe Working Loads (SWL/MBL) of fittings and lines documented and known to the crew? *
Operation and Manning
- Is the mooring station adequately manned by trained personnel under a responsible officer? *
- Are snap-back and danger zones identified and personnel kept clear of them during operations? *
- Is appropriate PPE worn and communication maintained between stations and the bridge? *
Records and Review
- Are mooring line inspection and replacement records maintained? *
- Are mooring-related incidents or near-misses reported and reviewed for corrective action? *
下载完整的Mooring Operations Safety Inspection检查清单
免费获取排版清晰、便于打印的 PDF,或可编辑的 Word 文档。
