simpl.
海事合规 13 项

IGF Code Gas-Fuelled Ship Readiness (LNG Bunkering & Operation)

此检查清单为英文版。

Assesses low-flashpoint fuel systems, bunkering safety, and crew competence for gas-fuelled ships under SOLAS Chapter II-1 Part G and the IGF Code.

SOLASIGF Code

免费 PDF 或 Word · 输入邮箱即可下载。

Fuel Containment and Piping

  • Are fuel storage tanks, tank connection spaces, and secondary barriers intact with no signs of leakage or damage? *
  • Are double-walled or duct-enclosed fuel pipes and their ventilation/inerting arrangements functioning correctly? *
  • Are pressure relief valves on fuel tanks in date and correctly set? *

Gas Detection and Safety Systems

  • Are fixed gas detection systems in fuel-handling and machinery spaces tested and operational? *
  • Is the emergency shutdown (ESD) system for fuel supply tested and functional? *
  • Are fire detection and fixed fire-extinguishing arrangements for fuel spaces operational? *
  • Is ventilation for fuel preparation and tank connection spaces operating at required capacity? *

Bunkering Operation

  • Is a ship-specific bunkering procedure and checklist completed before transfer? *
  • Is the bunkering safety zone established and controlled with ignition sources eliminated? *
  • Are ship-shore communication, ESD linkage, and dry-disconnect couplings verified before start? *

Crew Competence and Documentation

  • Do personnel involved hold IGF Code training (basic/advanced) appropriate to their duties? *
  • Is the ship's operational manual for the fuel system available and current? *
  • Are drills specific to gas-fuel emergencies conducted and recorded? *

下载完整的IGF Code Gas-Fuelled Ship Readiness (LNG Bunkering & Operation)检查清单

免费获取排版清晰、便于打印的 PDF,或可编辑的 Word 文档。