simpl.
开发建设指挥中心 16 项

Below-Grade Waterproofing Inspection Checklist

此检查清单为英文版。

An inspection checklist for below-grade and foundation waterproofing covering substrate prep, membrane application, drainage, and protection under IBC Section 1805.

IBC 2021 Sec. 1805ASTM D5385NRCA Waterproofing ManualACI 515

免费 PDF 或 Word · 输入邮箱即可下载。

Requirements & Substrate

  • Is waterproofing (vs. dampproofing) required based on the groundwater/hydrostatic condition? *
  • Is the concrete substrate cured, clean, and free of fins, voids, and honeycomb? *
  • Are cove fillets and corner treatments installed at wall/footing junctions? *
  • Are approved product data and details on site? *

Membrane Application

  • Is the primer applied and cured per the manufacturer before membrane installation? *
  • Is the membrane type (sheet/fluid-applied/bentonite) installed at the specified thickness or mil? *
  • Are seams, laps, and overlaps sealed to the required width? *
  • Are penetrations, tie-holes, and construction joints detailed and sealed? *

Terminations & Detailing

  • Are terminations and reglets at grade and transitions properly formed? *
  • Is reinforcement/detail membrane provided at inside/outside corners? *
  • Are cold joints and expansion joints bridged with the specified detail? *

Drainage & Protection

  • Is protection board or drainage composite installed before backfill? *
  • Is a foundation/perimeter drain installed with the specified aggregate and filter fabric? *
  • Is backfill placed without damaging the membrane? *
  • Where specified, was a flood/water test performed on horizontal areas? *
  • Photo of membrane and drainage board prior to backfill

下载完整的Below-Grade Waterproofing Inspection Checklist检查清单

免费获取排版清晰、便于打印的 PDF,或可编辑的 Word 文档。