부동산 점검 커맨드 센터 21개 항목
Wind Mitigation Inspection
이 체크리스트는 영어로 제공됩니다.
A wind-loss mitigation inspection documenting construction features that reduce hurricane damage, following the state uniform mitigation verification form used for insurance premium credits.
Uniform Mitigation Verification (OIR-B1-1802)FBC HVHZ
무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.
Building Code and Permit
- Property address *
- Year of original construction (or year of roof permit if re-roofed) *
- Building meets the applicable wind-borne debris / code adoption date for credit *
- Photo of permit documentation used to establish the year
Roof Covering
- Roof covering type *
- Roof covering meets current product-approval or code compliance (FBC/Miami-Dade NOA) *
- Permit/install date for the current roof covering
Roof Deck Attachment
- Nail type and size used to attach the roof deck *
- Nail spacing at the deck (inches on edge / field) *
- Roof deck attachment level qualifies for A, B, C, or D credit *
- Photo of the deck and fastener from the attic
Roof-to-Wall Connection
- Roof-to-wall connection type *
- Minimum number of connectors observed wraps the wall top plate as documented *
- Photo of the roof-to-wall connection
Roof Geometry and Secondary Water Resistance
- Predominant roof shape *
- Non-hip features total less than 10% of the total roof perimeter (if hip claimed)
- Secondary water resistance (self-adhering underlayment / SWR) is present *
Opening Protection
- All glazed openings are protected to the applicable impact rating *
- Non-glazed openings (doors, garage) are also rated for impact where credit is claimed *
- Opening protection level (A, B, C, N/X) documented for the credit *
- Photo of shutter/impact-rated label or product approval
Wind Mitigation Inspection 체크리스트 전체 다운로드
인쇄하기 좋은 PDF 또는 편집 가능한 Word 문서로 무료로 받으세요.
