해운 컴플라이언스 13개 항목
Heavy Weather and Voyage Planning Preparation
이 체크리스트는 영어로 제공됩니다.
Verifies passage-plan quality and heavy-weather preparations covering appraisal, planning, execution, monitoring, and securing for adverse conditions.
SOLASIMO Res. A.893
무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.
Passage Plan Appraisal and Planning
- Is a berth-to-berth passage plan prepared covering appraisal, planning, execution, and monitoring? *
- Are charts and publications corrected to the latest notices for the intended route? *
- Are no-go areas, under-keel clearance, and contingency/abort points identified? *
- Are weather routeing information and forecasts obtained for the passage? *
Stability and Loading for Weather
- Does the loading condition meet the intact stability criteria for the expected weather? *
- Are parametric-rolling and synchronous-rolling risks assessed for the route and heading? *
- Is the free-surface effect from slack tanks minimised before heavy weather? *
Securing for Heavy Weather
- Are cargo, lashings, and deck equipment additionally secured before deteriorating weather? *
- Are watertight doors, hatches, ventilators, and weathertight closures secured? *
- Are storm rails, lifelines, and access restrictions to exposed decks put in place? *
Bridge Monitoring
- Is the plan monitored with position fixing at appropriate intervals and speed adjusted for conditions? *
- Is course/speed alteration considered to reduce slamming, shipping of water, and rolling? *
- Are heavy-weather reports and any damage entered in the deck log? *
Heavy Weather and Voyage Planning Preparation 체크리스트 전체 다운로드
인쇄하기 좋은 PDF 또는 편집 가능한 Word 문서로 무료로 받으세요.
