토목 인프라 점검 17개 항목
Detention/Retention Pond Inspection
이 체크리스트는 영어로 제공됩니다.
Routine inspection of stormwater detention and retention (wet) ponds including embankment, outlet works, spillway, sediment storage, and vegetation.
EPA NPDES StormwaterUSACE Small Impoundment GuidanceLocal Stormwater Design Manual
무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.
Pond Information
- Pond ID / location *
- Date of inspection *
- Pond type (dry detention, wet retention, extended detention)
Embankment & Side Slopes
- Is the embankment free of erosion, rills, animal burrows, or seepage? *
- Are side slopes stable and vegetated with no slumping or bare areas? *
- Is the embankment crest free of settlement or cracking?
- Is woody vegetation absent from the embankment (per dam-safety practice)?
Outlet & Spillway
- Is the principal outlet/riser structure free of blockage, corrosion, or damage? *
- Is the trash rack/anti-vortex device intact and clear? *
- Is the emergency spillway free of erosion and obstruction? *
- Is the outfall/energy dissipator free of scour or undermining?
Sediment & Water Quality
- Is sediment accumulation below the cleanout threshold in the forebay and pond? *
- Measured sediment depth in forebay (inches)
- For wet ponds, is the permanent pool at design elevation (no drawdown/clogging)?
- Is the pond free of nuisance conditions (algae, odor, debris)?
Findings
- Were any maintenance deficiencies identified? *
- Maintenance actions recommended
Detention/Retention Pond Inspection 체크리스트 전체 다운로드
인쇄하기 좋은 PDF 또는 편집 가능한 Word 문서로 무료로 받으세요.
