일반 / 산업 공통 14개 항목
Emergency Evacuation Drill & Headcount Audit (29 CFR 1910.38)
이 체크리스트는 영어로 제공됩니다.
A checklist for planning, conducting, and evaluating an emergency evacuation drill, including route usability, accountability, and post-drill review.
29 CFR 1910.38NFPA 101
무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.
Pre-Drill Readiness
- Does the written emergency action plan define evacuation procedures and routes? *
- Are exit routes unobstructed, unlocked in the direction of travel, and clearly marked? *
- Are floor wardens/monitors assigned and briefed on their roles? *
Alarm & Evacuation
- Did the alarm activate and was it audible/visible throughout all occupied areas? *
- Did occupants evacuate promptly via the nearest safe exit route? *
- Were mobility-impaired occupants assisted per the plan? *
- Record the evacuation time from alarm to all-clear: *
Accountability
- Did all personnel report to designated assembly areas? *
- Was a headcount/roster reconciled and any missing person reported to responders? *
- Were visitors and contractors accounted for? *
Evaluation & Follow-up
- Was a post-drill debrief conducted to capture deficiencies? *
- Are corrective actions assigned with owners and due dates? *
- Is the drill documented with date, participants, and results? *
- Record the drill date and evaluator: *
Emergency Evacuation Drill & Headcount Audit (29 CFR 1910.38) 체크리스트 전체 다운로드
인쇄하기 좋은 PDF 또는 편집 가능한 Word 문서로 무료로 받으세요.
