RFI Process
- Does each RFI have a unique number, date, and clear description of the question? *
- Is a proposed solution or interpretation included by the requester? *
- Is a required-response date set to protect the schedule? *
- Is cost or schedule impact flagged on the RFI for change management follow-up? *
RFI Tracking
- Is an RFI log maintained showing status (open/answered/void) and aging? *
- Are overdue RFIs escalated to the design team? *
- Are answered RFIs distributed to all affected trades and incorporated into records? *
Submittal Register
- Is a submittal register organized by specification section (MasterFormat)? *
- Does the register list required submittal types (shop drawings, product data, samples, mock-ups)? *
- Are submittals scheduled to align with procurement and construction lead times? *
- Are deferred and long-lead submittals identified and prioritized? *
Review & Distribution
- Is the contractor's review/stamp applied before forwarding to the design team? *
- Is design team review turnaround tracked against the contract time? *
- Are review dispositions (approved / approved as noted / revise and resubmit) logged? *
- Are approved submittals distributed and superseded versions removed from the field? *