Demolition Permit & Hazardous Materials Survey Checklist

이 체크리스트는 영어로 제공됩니다.

A demolition permit and pre-demolition hazardous materials survey checklist covering asbestos, lead, and regulated abatement before structure removal.

NESHAP 40 CFR 61 Subpart MOSHA 29 CFR 1926.1101OSHA 29 CFR 1926.62IBC 2021 Sec. 3303

무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.

Permit & Notifications

  • Is a demolition permit obtained with an approved demolition plan? *
  • Has the required 10-working-day NESHAP demolition/renovation notification been submitted? *
  • Are utility disconnect confirmations (gas, electric, water, sewer) documented? *
  • Are adjacent property protection and pedestrian protection measures planned? *

Asbestos Survey (ACM)

  • Has a pre-demolition asbestos survey been performed by a licensed/accredited inspector? *
  • Are suspect materials sampled and analyzed (PLM), or assumed as ACM? *
  • Is regulated asbestos-containing material (RACM) abated before demolition? *
  • Are abatement waste manifests and disposal records retained? *

Lead & Other Regulated Materials

  • Has a lead-based paint assessment been completed? *
  • Are PCB-containing ballasts/transformers, mercury (lamps/thermostats), and refrigerants identified for removal? *
  • Are universal wastes segregated and managed per RCRA? *
  • Are underground/aboveground storage tanks identified and addressed? *

Demolition Safety

  • Has an engineering survey of structural stability been performed before demolition? *
  • Are dust control / water suppression measures in place? *
  • Are exclusion zones and fall/void protection established? *
  • Is worker respiratory and PPE protection provided per exposure assessment? *

Records

  • Are survey reports, notifications, and disposal manifests compiled for the file?
  • Photo of site pre-demolition condition
  • Responsible party signature