simpl.
개발 커맨드 센터 16개 항목

Curtain Wall Mock-Up & Water Penetration Test Checklist

이 체크리스트는 영어로 제공됩니다.

A checklist for curtain wall and fenestration mock-up performance testing covering air infiltration, static and dynamic water penetration, and structural load verification.

AAMA 501.1AAMA 501.2ASTM E1105ASTM E783ASTM E330

무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.

Mock-Up Setup & Documentation

  • Is the mock-up representative of the production curtain wall system and details? *
  • Are approved shop drawings, the test procedure, and performance criteria on site? *
  • Is the testing agency independent and qualified? *
  • Are the design pressures and acceptance criteria defined? *

Air Infiltration

  • Is air leakage measured at the specified test pressure? *
  • Does measured air infiltration meet the specified maximum rate? *
  • Are extraneous leakage paths sealed and accounted for? *

Water Penetration Testing

  • Is the calibrated spray rack set to the required flow before testing? *
  • Is static water penetration tested with a uniform pressure chamber? *
  • Is dynamic water penetration tested where specified? *
  • Is there no uncontrolled water penetration to the interior at test pressure? *
  • Are any leakage locations documented and remediated? *

Structural & Interstory Movement

  • Is structural performance verified at design and 1.5x design pressure? *
  • Are deflections and permanent set within the allowable limits? *
  • Where required, is interstory drift/movement testing performed? *
  • Photo of mock-up and spray-rack setup

Curtain Wall Mock-Up & Water Penetration Test Checklist 체크리스트 전체 다운로드

인쇄하기 좋은 PDF 또는 편집 가능한 Word 문서로 무료로 받으세요.