simpl.
개발 커맨드 센터 17개 항목

Architect QA/QC & Construction Document Code Review

이 체크리스트는 영어로 제공됩니다.

An in-house architect's quality control review of construction documents for coordination, code compliance, and completeness before issuing for permit or bid.

IBC 2021ADA StandardsICC A117.1IECC 2021

무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.

Drawing Coordination

  • Are architectural, structural, and MEP drawings dimensionally coordinated? *
  • Do plan, section, and detail references match and resolve? *
  • Are wall types, ratings, and schedules consistent across sheets? *
  • Are door, window, and finish schedules complete and cross-referenced? *

Code Compliance

  • Is a code summary sheet included (occupancy, type, area, egress)? *
  • Are occupant loads and egress calculations shown and correct? *
  • Are fire-rated assemblies and penetrations detailed? *
  • Is the energy compliance documentation included? *

Accessibility

  • Are accessible routes, clearances, and maneuvering spaces detailed? *
  • Are accessible restrooms shown with fixture/grab-bar dimensions? *
  • Are counters, controls, and signage locations compliant? *

Specifications & Details

  • Do specifications align with materials shown on drawings? *
  • Are waterproofing, flashing, and building envelope details complete? *
  • Are structural and special inspection notes coordinated with the SER? *

Issuance Readiness

  • Are all sheets titled, numbered, dated, and in the index? *
  • Are drawings sealed and signed by the responsible professionals? *
  • Is the QA/QC reviewer sign-off recorded?

Architect QA/QC & Construction Document Code Review 체크리스트 전체 다운로드

인쇄하기 좋은 PDF 또는 편집 가능한 Word 문서로 무료로 받으세요.