생명과학 eQMS 16개 항목
Container Closure Integrity Testing (CCIT) Checklist (USP <1207>)
이 체크리스트는 영어로 제공됩니다.
Verifies that a container closure integrity testing program uses validated, appropriately sensitive methods to demonstrate that sterile product packaging maintains a barrier to microbial ingress and gas or liquid leakage. Use when establishing or reviewing a CCIT program.
USP <1207>21 CFR 211EU GMP Annex 1
무료 PDF 또는 Word · 이메일을 입력하면 다운로드할 수 있습니다.
Program Scope and Method Selection
Define what is tested and why.
- Is a documented rationale in place for selecting deterministic CCIT methods over probabilistic methods where feasible? *
- Are all sterile container closure systems in scope identified, including vials, syringes, cartridges, and ampoules? *
- Is the maximum allowable leakage limit (MALL) defined based on product and microbial ingress risk? *
- Select the primary CCIT method employed. *
- Has CCIT replaced or supplemented probabilistic dye ingress or microbial immersion methods where justified?
Method Validation and Sensitivity
- Is the CCIT method validated with positive controls at or below the MALL using known defect standards? *
- Are laser-drilled or micropipette defect standards traceable and characterized for defect size? *
- Is method sensitivity, specificity, and the limit of detection established and documented? *
- Record the smallest detectable defect size validated for the method (microns).
Lifecycle and Sampling
- Is CCIT applied at appropriate lifecycle stages, including package development, validation, and stability? *
- Is CCIT used to support stability rather than sterility testing for closed containers where appropriate?
- Are worst-case conditions, such as freezing, shipping, and capping variability, challenged? *
- Is the sampling plan statistically justified for routine and stability testing? *
Documentation and Change Control
- Are CCIT results reviewed and approved by the quality unit? *
- Is CCIT re-evaluated when the container, closure, capping process, or product formulation changes? *
- Are failed integrity results investigated with product impact assessment? *
Container Closure Integrity Testing (CCIT) Checklist (USP <1207>) 체크리스트 전체 다운로드
인쇄하기 좋은 PDF 또는 편집 가능한 Word 문서로 무료로 받으세요.
