一般/業界横断 19項目
Fire Safety & Emergency Action Plan (29 CFR 1910.38)
このチェックリストは英語版です。
Verifies a compliant written Emergency Action Plan, evacuation readiness, and fire prevention controls.
29 CFR 1910.3829 CFR 1910.3929 CFR 1910.157
無料のPDFまたはWord・メールアドレスを入力してダウンロード。
Written Emergency Action Plan
Required elements of an EAP under 29 CFR 1910.38.
- Is there a written Emergency Action Plan available to employees (required if 11+ employees)? *
- Does the plan include procedures for reporting a fire or other emergency? *
- Does the plan include evacuation procedures and emergency escape route assignments? *
- Does the plan include procedures to account for all employees after evacuation? *
Alarm & Notification Systems
- Is an employee alarm system in place and distinctive for each purpose? *
- Is the alarm audible or visible above ambient noise/light levels throughout the workplace? *
- Are emergency contact numbers and the means of reporting emergencies posted? *
Evacuation Readiness
- Are evacuation route maps posted at conspicuous locations on each floor? *
- Are designated assembly/muster points established and communicated? *
- Are named individuals assigned to assist in a safe and orderly evacuation? *
- Are evacuation needs identified for employees with disabilities? *
Fire Prevention Controls
- Are flammable and combustible materials stored in approved containers and cabinets? *
- Are portable fire extinguishers of the correct class provided and within travel-distance limits? *
- Are ignition sources controlled and 'No Smoking' areas enforced where required? *
- Is sprinkler/standpipe access unobstructed with 18 inches clearance below sprinkler heads? *
Training & Drills
- Are employees trained on the EAP at initial assignment and when responsibilities change? *
- Date of most recent evacuation drill: *
- Were drill deficiencies documented and corrected? *
- Plan reviewer sign-off: *
Fire Safety & Emergency Action Plan (29 CFR 1910.38)チェックリストの完全版をダウンロード
印刷しやすいPDF、または編集可能なWord文書で無料で入手できます。
