simpl.
Centre de pilotage Promotion immobilière 16 points

LEED v4.1 Certification Readiness Checklist

Cette liste de contrôle est en anglais.

A readiness checklist for project teams pursuing LEED v4.1 Building Design and Construction certification to confirm prerequisites and documentation before submitting to GBCI.

LEED v4.1 BD+CASHRAE 90.1-2016ASHRAE 62.1

PDF ou Word gratuit · saisissez votre e-mail pour le télécharger.

Registration & Integrative Process

  • Is the project registered on LEED Online and the rating system confirmed? *
  • Has the minimum program requirements (MPR) compliance been verified? *
  • Was an integrative process analysis completed during early design? *
  • Is a credit scorecard maintained with target certification level and point buffer? *

Location, Sites & Water

  • Are construction activity pollution prevention records (SWPPP) maintained? *
  • Is outdoor water use reduction documented via landscape/irrigation calcs? *
  • Is indoor water use reduction met with fixture flow/flush documentation? *
  • Is building-level water metering in place? *

Energy & Atmosphere

  • Has fundamental commissioning of energy systems been completed? *
  • Does the energy model demonstrate the minimum energy performance improvement? *
  • Is building-level energy metering installed? *
  • Is fundamental refrigerant management (no CFC-based) documented? *

Materials & Indoor Environmental Quality

  • Is construction and demolition waste diversion tracked with receipts? *
  • Are EPDs, sourcing, and material ingredient documentation collected? *
  • Is minimum indoor air quality performance (ASHRAE 62.1) demonstrated? *
  • Is environmental tobacco smoke control and a low-emitting materials log maintained? *

Téléchargez la liste de contrôle LEED v4.1 Certification Readiness Checklist complète

Obtenez-la gratuitement en PDF propre et imprimable, ou en document Word modifiable.