simpl.
eQMS Sciences de la vie 13 points

Laboratory Information Management System (LIMS) Validation Checklist

Cette liste de contrôle est en anglais.

Confirms that a Laboratory Information Management System is validated for its intended use with controls over configuration, interfaces, security, and data integrity. Use to plan or audit a LIMS validation.

GAMP 5EU GMP Annex 1121 CFR Part 1121 CFR 211.68

PDF ou Word gratuit · saisissez votre e-mail pour le télécharger.

Validation Planning and Requirements

Establish the validation approach.

  • Is a validation plan in place based on a risk assessment and GAMP software category? *
  • Are user requirements and functional specifications documented and traceable to testing? *
  • Is the supplier assessed or audited to leverage their development lifecycle?

Configuration and Interfaces

  • Are specification limits, calculations, and workflows configured and verified against approved methods? *
  • Are instrument and enterprise interfaces (e.g., CDS, ERP) validated for accurate data transfer? *
  • Are automated calculations independently verified? *

Security and Data Integrity

  • Are user access, role-based permissions, and segregation of duties configured and controlled? *
  • Are audit trails enabled, secure, and reviewed for data-critical changes? *
  • Are electronic signatures implemented and linked to their records where used? *
  • Are backup, restore, archival, and disaster recovery procedures tested? *

Testing, Release, and Maintenance

  • Is installation, operational, and performance qualification (IQ/OQ/PQ) documented and approved? *
  • Is a validation summary report approved before release for GMP use? *
  • Is the LIMS maintained in a validated state through periodic review and change control? *

Téléchargez la liste de contrôle Laboratory Information Management System (LIMS) Validation Checklist complète

Obtenez-la gratuitement en PDF propre et imprimable, ou en document Word modifiable.