Cumplimiento en recursos naturales 12 elementos
Pipeline Pigging & Inline Inspection (ILI) Checklist
Esta lista de verificación está en inglés.
Verify launch/receive safety, tool run planning, and data validation for cleaning pigs and inline inspection tools used in pipeline integrity management programs.
49 CFR 195.45249 CFR 192.493API STD 1163NACE SP0102
PDF o Word gratuito · introduzca su correo electrónico para descargar.
Line Preparation & Cleaning
- Has line cleanliness been established with cleaning pig runs before the inline inspection tool is run? *
- Have pipeline diameter changes, tight bends, and valve bore restrictions been verified to pass the selected tool? *
- Is a gauging or geometry pig run performed to confirm passage before the ILI tool? *
Launcher & Receiver Safety
- Is the pig trap depressurized, vented, and drained before the closure is opened? *
- Is the pressure-relieving and interlock system on the trap closure verified operational? *
- Are personnel positioned clear of the trap closure and end-cap discharge path during launch and receipt? *
Tool Run & Tracking
- Was the ILI tool type (MFL, UT, geometry) selected appropriate to the anticipated threats (metal loss, cracking, dents)? *
- Are above-ground markers and tracking used to confirm tool location and velocity during the run? *
- Was flow velocity maintained within the tool's specified operating range? *
Data Validation & Integrity Action
- Was the ILI data validated against known features and verified for adequate coverage and sensor performance? *
- Were reported anomalies assessed against remaining-strength criteria to determine repair or reinspection response? *
- Are dig verifications performed to confirm tool sizing accuracy where warranted? *
Descargue la lista de verificación Pipeline Pigging & Inline Inspection (ILI) Checklist completa
Obténgala gratis como PDF limpio e imprimible o como documento de Word editable.