simpl.
Cumplimiento marítimo 11 elementos

ECDIS Operation and Navigation Safety Inspection

Esta lista de verificación está en inglés.

Verifies ECDIS configuration, chart currency, backup arrangements, and operator competence under SOLAS Chapter V.

SOLAS

PDF o Word gratuito · introduzca su correo electrónico para descargar.

System Type Approval and Backup

  • Is the ECDIS type-approved and, where used as the primary means of navigation, supported by an approved backup arrangement? *
  • Is the software maintained to the latest approved version (IHO presentation/S-52/S-63 standards)? *
  • Is the backup (second ECDIS or approved paper charts) available and current? *

Chart Data and Updates

  • Are ENCs for the intended voyage installed, licensed, and updated with the latest corrections? *
  • Enter the date of the last ENC update applied. *
  • Are relevant navigational warnings and T&P notices reviewed and accounted for? *

Safety Settings and Route

  • Are safety depth, safety contour, and safety-related alarms set appropriately for the ship's draught and passage? *
  • Is the planned route checked by the ECDIS route-check function against safety parameters? *
  • Are position sensors (GNSS) and heading inputs verified and cross-checked against independent means? *

Competence and Records

  • Have watchkeepers completed generic and type-specific ECDIS training? *
  • Are ECDIS logs/voyage recordings retained as required? *

Descargue la lista de verificación ECDIS Operation and Navigation Safety Inspection completa

Obténgala gratis como PDF limpio e imprimible o como documento de Word editable.