Centro de Mando de Gobierno 15 elementos
NEPA Environmental Review Checklist
Esta lista de verificación está en inglés.
Guides an agency or grantee through the National Environmental Policy Act review pathway: categorical exclusion, environmental assessment, or environmental impact statement.
NEPA (42 U.S.C. 4321)40 CFR 1500-1508Agency NEPA Procedures
PDF o Word gratuito · introduzca su correo electrónico para descargar.
Applicability & Level of Review
- Is the action a 'major federal action' subject to NEPA (including federally funded actions)? *
- Level of NEPA review determined: *
- If a categorical exclusion is claimed, is it listed in the agency's NEPA procedures and free of extraordinary circumstances? *
- Have other environmental laws (ESA, NHPA Section 106, Clean Water/Air Act) been coordinated? *
Environmental Assessment (EA)
- Does the EA describe the purpose and need, alternatives, and affected environment? *
- Does the EA analyze direct, indirect, and cumulative effects? *
- Was the public and affected agencies given opportunity to comment on the EA? *
- Does the review result in a Finding of No Significant Impact (FONSI) or a decision to prepare an EIS? *
Environmental Impact Statement (EIS)
- Was a Notice of Intent published and scoping conducted? *
- Does the draft EIS analyze a reasonable range of alternatives including no-action? *
- Was the draft EIS circulated for the required public comment period? *
- Does the final EIS respond to substantive comments and lead to a Record of Decision (ROD)? *
Documentation & Mitigation
- Is the administrative record complete and available for the decision? *
- Are mitigation commitments identified and a monitoring/enforcement plan established? *
- Were page and time limits (75/150/300 pages; 1-2 year presumptive limits) observed? *
Descargue la lista de verificación NEPA Environmental Review Checklist completa
Obténgala gratis como PDF limpio e imprimible o como documento de Word editable.
