simpl.
Civil Infrastructure Inspection 17 items

Geotechnical Instrumentation Monitoring

Field monitoring and data-review checklist for geotechnical instrumentation such as inclinometers, piezometers, settlement points, and crack gauges on slopes, walls, and embankments.

FHWA-NHI-98-034 Geotechnical InstrumentationUSACE EM 1110-2-1908ASTM D6230 / D7299

Free PDF · enter your email to download.

Monitoring Setup

  • Project / site name *
  • Date of reading *
  • Instrument type(s) read this visit
  • Is the instrumentation and monitoring plan (thresholds, frequency) referenced? *

Instrument Condition

  • Are instrument enclosures, caps, and reference points intact and undisturbed? *
  • Are readout units/dataloggers calibrated and functioning? *
  • Are survey control/benchmarks stable and verified?
  • Is automated data acquisition (if used) transmitting valid data?

Data Collection

  • Were inclinometer profiles read in both A and B axes with checksums verified?
  • Were piezometer water levels/pressures recorded?
  • Were settlement/heave and crack-gauge measurements recorded?
  • Latest reading value (units per instrument)

Data Review & Thresholds

  • Are current readings within established alert/action thresholds? *
  • Do trends show accelerating movement or pore-pressure rise? *
  • Was any threshold exceedance reported per the notification protocol?

Findings

  • Is continued/increased monitoring or engineering review recommended? *
  • Notes and observations

Download the full Geotechnical Instrumentation Monitoring checklist

Get it as a clean, printable PDF — free.