DOT Construction Inspection Daily Report
Daily inspector documentation of contractor activity, materials acceptance, testing, quantities, and safety on a DOT construction project.
AASHTO Construction InspectionFHWA Construction Program ManagementState DOT Standard Specifications
Free PDF · enter your email to download.
Project & Conditions
- Project / contract number *
- Report date *
- Weather and temperature conditions affecting work
- Contractor and subcontractors on site
Work Performed
- Is work performed consistent with approved plans, specifications, and shop drawings? *
- Description of work performed and locations (stations) *
- Labor and equipment on site documented?
- Are any deviations, RFIs, or field changes documented? *
Materials & Testing
- Do delivered materials have required certifications / mill certs / approved-source documentation? *
- Were required acceptance tests performed (concrete slump/air, density/compaction, gradation)?
- Did all field/lab test results meet specification tolerances? *
- Number of test samples taken today
Quantities
- Are installed pay quantities measured and recorded for progress payment? *
- Are quantities supported by field measurements / tickets?
- Are force-account / extra work items documented separately with justification?
Safety & Traffic Control
- Is the approved temporary traffic control plan in place and maintained? *
- Were any safety incidents, near-misses, or unsafe conditions observed? *
- Inspector signature *