Civil Infrastructure Inspection 16 items

Bridge Load Rating Readiness & Data Verification

Verification that a bridge has current, defensible load rating inputs, condition-based capacity factors, and posting where required.

AASHTO Manual for Bridge Evaluation (MBE)23 CFR 650.313 load ratingFHWA LRFR

Free PDF · enter your email to download.

Rating Currency

  • Structure number *
  • Does the bridge have a current load rating for the required legal and design loads? *
  • Was the load rating re-evaluated after the most recent inspection findings or condition change? *
  • Date of most recent load rating

Rating Inputs & Method

  • Is the rating method (LRFR / LFR / ASR) documented and appropriate for the structure? *
  • Do span geometry, member sizes, and material properties in the rating match as-built/plan data? *
  • Are dead load and wearing surface assumptions consistent with current field conditions?

Condition-Based Adjustments

  • Are section loss, deterioration, and defects from the latest inspection reflected in member capacity? *
  • Are condition/system factors applied consistent with observed member condition states?
  • Governing rating factor (RF) for the controlling member/load

Posting & Restrictions

  • If the rating requires it, is the bridge posted for load limits and are signs installed? *
  • Are posted load limits consistent between the rating, NBI records, and field signage? *
  • Is a permit-vehicle review process in place for loads exceeding legal limits?

Documentation

  • Are load rating calculations sealed by a licensed professional engineer and archived? *
  • Are rating results, dates, and assumptions recorded in the bridge management/NBI system? *