simpl.
Морской комплаенс Пунктов: 13

Tugboat and Towing Operations Safety

Этот чек-лист на английском языке.

Assesses towing gear, girting prevention, and communications for tug and tow operations, covering connection, watchkeeping, and emergency release.

ISM CodeIMO Res. A.535COLREGs

Бесплатно в PDF или Word · укажите email, чтобы скачать.

Towing Gear Inspection

  • Are the towline, bridle, and connecting hardware inspected and within their certified safe working load? *
  • Is the towing winch, hook, and its emergency (quick) release tested and functioning? *
  • Are gob ropes, gog wires, or tow pins available and rigged to control the towline lead? *
  • Enter the certified breaking load of the main towline in tonnes.

Girting and Capsize Prevention

  • Is the crew briefed on girting (girding) risk and the actions to slip or release the tow immediately? *
  • Are self-release or quick-release arrangements accessible to the tug operator at all times during towing? *
  • Is the tug's stability and freeboard suitable for the towing forces expected in the operation? *

Communications and Watchkeeping

  • Is reliable two-way communication established between the tug, the tow, and any controlling station? *
  • Are the required towing lights and shapes displayed for the length of the tow? *
  • Is a dedicated lookout and helm watch maintained throughout the towing operation? *

Emergency Preparedness

  • Is a towing emergency plan available covering parting of the tow, girting, and personnel recovery? *
  • Are personnel prohibited from standing in the bight or snap-back zone of working lines? *
  • Is a means to recover a lost tow, such as a messenger or emergency towing pennant, available? *

Скачайте полный чек-лист «Tugboat and Towing Operations Safety»

Получите его бесплатно в виде аккуратного PDF для печати или редактируемого документа Word.