Sustainability Command Center Пунктов: 19
ISO 50001 Energy Management System Readiness Checklist
Этот чек-лист на английском языке.
Assess readiness to establish, certify, and maintain an energy management system that drives continual improvement in energy performance under ISO 50001.
ISO 50001:2018
Бесплатно в PDF или Word · укажите email, чтобы скачать.
Context & Energy Policy
- Have the internal and external issues relevant to energy performance been identified? *
- Have the needs and expectations of interested parties affecting energy performance been determined? *
- Has top management established a documented energy policy appropriate to the nature and scale of energy use? *
- Is the scope and boundaries of the EnMS defined and documented? *
Energy Review & Baseline
- Has an energy review been conducted to analyze energy use and consumption based on measurement? *
- Have significant energy uses (SEUs) been identified and prioritized? *
- Has an energy baseline (EnB) been established using data from a suitable period? *
- Have energy performance indicators (EnPIs) appropriate for monitoring energy performance been established? *
Objectives, Targets & Action Plans
- Have energy objectives and energy targets been established at relevant functions and levels? *
- Do action plans define responsibilities, means, resources, and timeframes for achieving targets? *
- Are the methods for verifying results of energy performance improvement defined? *
Operation & Competence
- Are operational criteria established for facilities, equipment, and processes related to SEUs? *
- Is energy performance a consideration in the design of new, modified, or renovated facilities? *
- Are energy performance criteria included in procurement of energy-using equipment and services? *
- Have personnel affecting energy performance been determined to be competent and provided awareness? *
Monitoring, Audit & Improvement
- Is there a documented plan for monitoring, measurement, analysis, and evaluation of energy performance? *
- Are internal audits of the EnMS conducted at planned intervals? *
- Does top management conduct management reviews including energy performance and EnPIs? *
- Are nonconformities addressed through corrective action and continual improvement demonstrated? *
Скачайте полный чек-лист «ISO 50001 Energy Management System Readiness Checklist»
Получите его бесплатно в виде аккуратного PDF для печати или редактируемого документа Word.
