simpl.
Manajemen Mutu (QMS) 13 butir

IATF 16949 Warranty Management Checklist

Daftar periksa ini dalam bahasa Inggris.

A checklist for managing warranty including a warranty process, part analysis, no-trouble-found (NTF) handling, and field-failure test analysis per IATF 16949 Clause 10.2.5.

IATF 16949:2016AIAG Warranty (WMPP)

PDF atau Word gratis · masukkan email Anda untuk mengunduh.

Warranty Process (Cl. 10.2.5)

  • Is a documented warranty management process implemented? *
  • Does the process include a method for warranty part analysis, including NTF? *
  • Are customer-specific warranty requirements applied where required? *

Warranty Part Analysis

  • Are returned warranty parts collected, tracked, and analyzed within agreed timeframes? *
  • Is a structured analysis method (e.g., AIAG WMPP or 5-Step) applied to warranty returns? *
  • Are root causes identified and linked to corrective action? *
  • Warranty claim / part reference

No-Trouble-Found (NTF) Handling

  • Is a defined method used to analyze and reduce NTF parts? *
  • Are NTF rates tracked and trended?
  • Current NTF rate (%)

Field Failure Test Analysis (Cl. 10.2.6)

  • Is field failure test analysis performed to determine root cause where products fail in the field? *
  • Are field failure results and corrective actions communicated to the customer? *
  • Are warranty and field-failure metrics reviewed in management review?

Unduh daftar periksa IATF 16949 Warranty Management Checklist lengkap

Dapatkan secara gratis sebagai PDF yang rapi dan siap cetak atau dokumen Word yang dapat diedit.