simpl.
Manajemen Mutu (QMS) 12 butir

IATF 16949 Total Productive Maintenance (TPM) Checklist (Clause 8.5.1.5)

Daftar periksa ini dalam bahasa Inggris.

A checklist for a documented total productive maintenance system covering planned and predictive maintenance, spare parts, and machine effectiveness objectives under IATF 16949 Clause 8.5.1.5.

IATF 16949:2016

PDF atau Word gratis · masukkan email Anda untuk mengunduh.

TPM System & Equipment Identification

  • Is a documented total productive maintenance system developed, implemented, and maintained? *
  • Have process equipment and machinery necessary to meet production requirements been identified? *
  • Is the availability of replacement parts for the identified equipment assured? *

Planned & Predictive Maintenance

  • Are resources for machine, equipment, and facility maintenance provided? *
  • Is planned (preventive) maintenance packaged and executed on schedule? *
  • Are predictive maintenance methods used and continually improved? *

Objectives & Effectiveness

  • Are documented maintenance objectives established (e.g., OEE, MTBF, MTTR)? *
  • Is overall equipment effectiveness (OEE) monitored against targets? *
  • Current OEE / availability metric

Periodic Overhaul & Review

  • Is periodic overhaul or rebuild of equipment performed and documented? *
  • Are maintenance objectives and TPM performance reviewed by management? *
  • Is operator-led autonomous maintenance (cleaning, inspection, lubrication) implemented?

Unduh daftar periksa IATF 16949 Total Productive Maintenance (TPM) Checklist (Clause 8.5.1.5) lengkap

Dapatkan secara gratis sebagai PDF yang rapi dan siap cetak atau dokumen Word yang dapat diedit.