simpl.
Manajemen Mutu (QMS) 14 butir

Control Plan Development Checklist (AIAG-VDA)

Daftar periksa ini dalam bahasa Inggris.

A checklist for developing and maintaining production control plans linking process characteristics to controls, reaction plans, and measurement methods per AIAG-VDA and IATF 16949.

AIAG-VDAIATF 16949:2016

PDF atau Word gratis · masukkan email Anda untuk mengunduh.

Control Plan Scope & Phase

  • Is the correct control plan phase identified (prototype, pre-launch, or production)? *
  • Does the control plan cover all process operations from receiving through shipping? *
  • Is the control plan part/family and revision level identified? *

Characteristic & Requirement Linkage

  • Are product and process characteristics traceable to the PFMEA and design records? *
  • Are special/significant characteristics flagged with the correct symbols? *
  • Are specifications and tolerances listed for each characteristic? *

Controls & Measurement Methods

  • Is an evaluation/measurement technique specified for each characteristic? *
  • Are sample size and frequency defined for each control? *
  • Is the control method (SPC, error-proofing, inspection, etc.) documented? *
  • Are measurement systems referenced in the plan MSA-validated?

Reaction Plans & Maintenance

  • Does each control have a defined reaction plan for nonconforming output? *
  • Is the control plan reviewed and updated when the process, product, or measurement method changes? *
  • Is the control plan approved by required functions (including customer where required)? *
  • Is the control plan available at the point of use? *

Unduh daftar periksa Control Plan Development Checklist (AIAG-VDA) lengkap

Dapatkan secara gratis sebagai PDF yang rapi dan siap cetak atau dokumen Word yang dapat diedit.