simpl.
सिविल इन्फ्रास्ट्रक्चर निरीक्षण 17 आइटम

Lift/Pump Station SCADA Inspection

यह चेकलिस्ट अंग्रेज़ी में है।

Inspection of wastewater lift and pump stations including pumps, wet well, controls, and SCADA/telemetry systems for reliability, alarms, and safety compliance.

Ten States StandardsNFPA 820 (Wastewater Facilities)EPA Water/Wastewater SCADA Guidance

मुफ़्त PDF या Word · डाउनलोड करने के लिए अपना ईमेल दर्ज करें।

Station Identification

  • Station name / ID *
  • Date of inspection *
  • Station type (submersible, dry-pit, wet-pit, grinder)

Pumps & Wet Well

  • Are all pumps operational and cycling normally with no unusual noise/vibration? *
  • Are pump run-time and cycle counts balanced (alternation working)?
  • Is the wet well free of excessive grease, debris, or grit accumulation? *
  • Are check valves and isolation valves operating without leakage?

Controls & SCADA

  • Do level sensors (float/transducer) accurately control pump start/stop setpoints? *
  • Does the SCADA/telemetry system report status and transmit alarms to the operations center? *
  • Were alarm functions tested (high wet-well, pump failure, power loss)? *
  • Is the control panel/PLC free of faults and within firmware standards?

Power & Safety

  • Is standby/backup power (generator or ATS) tested and functional? *
  • Is confined-space entry signage and ventilation adequate per NFPA 820? *
  • Is gas/hazardous atmosphere monitoring in place where required?
  • Are electrical enclosures, grounding, and GFCI protection intact?

Findings

  • Were any deficiencies or reliability concerns identified? *
  • Notes and recommended actions

पूरी Lift/Pump Station SCADA Inspection चेकलिस्ट डाउनलोड करें

इसे साफ़-सुथरे, प्रिंट करने योग्य PDF या संपादन योग्य Word दस्तावेज़ के रूप में मुफ़्त पाएँ।