Offshore Supply Vessel Cargo Operations

Diese Checkliste ist auf Englisch.

Covers deck and bulk cargo operations alongside offshore installations for supply vessels, including 500-metre zone entry, tank cargoes, and lifting.

OSV Chemical CodeIMO Res. A.863ISM Code

Kostenlos als PDF oder Word · E-Mail-Adresse eingeben und herunterladen.

Approach and 500-Metre Zone

  • Is permission obtained from the installation before entering the 500-metre safety zone? *
  • Is the vessel's manoeuvring and positioning capability confirmed adequate for the prevailing weather before approach? *
  • Are risk assessments and toolbox talks completed for operations near the installation? *
  • Is communication with the installation established on the agreed working channel? *

Deck Cargo Handling

  • Is deck cargo secured, and are certified lifting slings and containers used for craning to the installation? *
  • Are personnel kept clear of suspended loads and the crane operating area during lifting? *
  • Is the deck non-slip and clear of obstructions and trip hazards for the deck crew? *

Bulk and Liquid Cargo Transfer

  • Are cargo hoses, couplings, and manifolds inspected and rated for the products transferred? *
  • For hazardous bulk liquids, are the OSV Chemical Code carriage requirements met? *
  • Is an emergency stop and disconnection procedure agreed and understood by both vessel and installation? *
  • Enter the number of bulk products to be transferred during this call.

Weather and Emergency Limits

  • Are operational weather limits defined and are operations suspended when they are exceeded? *
  • Is the vessel ready to move clear of the installation immediately if an emergency is declared? *