Maritime Compliance 16 Punkte
MARPOL Annex VI Air Pollution Prevention
Diese Checkliste ist auf Englisch.
Confirms fuel oil sulphur compliance, NOx controls, ozone-depleting substances, and IAPP documentation under MARPOL Annex VI.
MARPOL Annex VI
Kostenlos als PDF oder Word · E-Mail-Adresse eingeben und herunterladen.
Certification and Documentation
- Is a valid International Air Pollution Prevention (IAPP) Certificate on board with a matching supplement? *
- Is an approved SOx/fuel-change-over procedure (or SEEMP with fuel oil switching) documented and available? *
- Is the ship's technical record of NOx emission control devices and their IAPP supplement consistent with the equipment on board? *
Fuel Oil Sulphur Compliance
- Is the fuel oil sulphur content within the applicable global cap (0.50% m/m) or 0.10% within Emission Control Areas? *
- Are Bunker Delivery Notes (BDNs) retained for 3 years and representative fuel samples retained for 12 months? *
- Where an exhaust gas cleaning system (scrubber) is used as an equivalent, is it approved and continuously monitored? *
- Is the fuel oil changeover log completed with dates, times, positions, and tank quantities on entering/leaving an ECA? *
NOx Emission Control
- Do diesel engines over 130 kW have a valid EIAPP Certificate and NOx Technical File on board? *
- Is the engine's onboard NOx verification (parameter check or record book) maintained consistent with the Technical File? *
- For engines using selective catalytic reduction (SCR) or EGR to meet Tier III in a NOx ECA, is the system operational and its use recorded?
Ozone-Depleting Substances and Other Emissions
- Is an Ozone-Depleting Substances Record Book maintained for refrigerant recharges, top-ups, and disposals? *
- Are shipboard incinerators (where fitted) type-approved and operated within permitted temperature and feed limits? *
- Are volatile organic compound (VOC) management measures applied for applicable tankers?
Energy Efficiency
- Is the ship-specific Ship Energy Efficiency Management Plan (SEEMP) on board, including the Part III implementation plan where applicable? *
- Is a valid International Energy Efficiency (IEE) Certificate on board for applicable ships? *
- Is fuel consumption data collected and reported under the IMO Data Collection System (DCS) for applicable ships?
Vollständige Checkliste MARPOL Annex VI Air Pollution Prevention herunterladen
Kostenlos als übersichtliches, druckfertiges PDF oder als bearbeitbares Word-Dokument.
