Maritime Compliance 15 Punkte
Bunkering Operation Safety Checklist
Diese Checkliste ist auf Englisch.
Pre-, during-, and post-transfer checks for safe fuel bunkering to prevent spills and ensure fuel quality documentation under MARPOL and the ISM Code.
MARPOL Annex IMARPOL Annex VIISM Code
Kostenlos als PDF oder Word · E-Mail-Adresse eingeben und herunterladen.
Pre-Transfer Preparations
- Has a pre-transfer meeting/agreement been completed with the supplier on rate, sequence, and emergency signals? *
- Are scuppers plugged and drip trays/save-alls in place under all connection points? *
- Is the SOPEP equipment ready and the spill response plan reviewed before transfer? *
- Are tank soundings/ullages taken and confirmed sufficient space with an agreed maximum fill level? *
- Is the bunker hose/loading arm certified, in good condition, and correctly connected with drip trays? *
Communications and Safety Precautions
- Is effective communication established between the ship and the barge/terminal for the duration? *
- Are no-smoking and no-naked-flame rules enforced and warning signals/flags displayed? *
- Are firefighting appliances positioned and ready near the bunker station? *
During Transfer
- Is a continuous watch maintained at the bunker station and tank soundings monitored throughout? *
- Is a representative fuel sample being drawn continuously at the ship's manifold (MARPOL sample)? *
- Enter the agreed maximum transfer rate (m3/h).
Completion and Documentation
- Have lines been drained/blown, valves closed, and connections blanked before disconnecting? *
- Is a Bunker Delivery Note received and retained on board for at least 3 years? *
- Is the sealed MARPOL fuel sample retained on board for at least 12 months? *
- Is the bunkering operation recorded in the Oil Record Book Part I? *
Vollständige Checkliste Bunkering Operation Safety Checklist herunterladen