Quality Management (QMS) 22 items
ISO 9001:2015 Design & Development Control Checklist
A checklist for controlling design and development of products and services against the planning, inputs, controls, outputs, and change requirements of ISO 9001:2015 Clause 8.3.
ISO 9001:2015
Free PDF · enter your email to download.
Design & Development Planning (Cl. 8.3.2)
- Have the stages and controls for design and development been determined considering the nature, duration, and complexity of the activities? *
- Are required review, verification, and validation activities defined for each stage? *
- Are responsibilities and authorities for the D&D process assigned? *
- Have the internal and external resource needs for design and development been identified? *
- Is the level of control expected by customers and other interested parties documented? *
Design & Development Inputs (Cl. 8.3.3)
- Are functional and performance requirements determined as design inputs? *
- Have applicable statutory and regulatory requirements been captured as inputs? *
- Are standards or codes of practice the organization has committed to implement included? *
- Have potential consequences of failure due to the nature of the products and services been considered? *
- Are inputs adequate, complete, unambiguous, and free of conflict? *
Design & Development Controls (Cl. 8.3.4)
- Are the results to be achieved by the design activity defined? *
- Are reviews conducted to evaluate the ability of results to meet requirements? *
- Is verification performed to ensure outputs meet input requirements? *
- Is validation conducted to confirm products/services meet requirements for the specified application or intended use? *
- Are actions taken on problems determined during reviews, verification, and validation retained as documented information? *
Design & Development Outputs (Cl. 8.3.5)
- Do outputs meet the input requirements? *
- Are outputs adequate for the subsequent processes for provision of products and services? *
- Do outputs include or reference monitoring and measuring requirements and acceptance criteria? *
- Do outputs specify characteristics essential for the intended purpose and safe and proper provision? *
Design & Development Changes (Cl. 8.3.6)
- Are changes made during or subsequent to design and development identified, reviewed, and controlled? *
- Is documented information retained on the changes, the results of reviews, authorization, and actions to prevent adverse impacts? *
- Change reference / ECN number
Download the full ISO 9001:2015 Design & Development Control Checklist checklist
Get it as a clean, printable PDF — free.