IATF 16949 APQP Product Realization Checklist

Tracks Advanced Product Quality Planning deliverables across the five APQP phases for a new automotive product launch.

IATF 16949:2016AIAG APQP 2nd Edition

Free PDF · enter your email to download.

Phase 1 — Plan & Define Program

  • Are the voice of the customer, business plan, and product/process assumptions captured? *
  • Are design goals, reliability and quality goals, and a preliminary bill of material defined? *
  • Is a preliminary listing of special product and process characteristics established? *

Phase 2 — Product Design & Development

  • Is the Design FMEA completed and risk reduced? *
  • Are design for manufacturability and assembly reviews and design verification plans complete? *
  • Are engineering drawings, specifications, and new equipment/tooling requirements defined? *

Phase 3 — Process Design & Development

  • Are packaging standards, process flow, floor plan, and characteristics matrix complete? *
  • Is the Process FMEA completed with actions to reduce risk? *
  • Is a pre-launch control plan and measurement systems analysis plan established? *

Phase 4 — Product & Process Validation

  • Is a significant production run conducted to validate the process? *
  • Are MSA and preliminary process capability studies completed and acceptable? *
  • Is PPAP approved and the production control plan finalized? *

Phase 5 — Feedback, Assessment & Corrective Action

  • Is variation reduced and customer satisfaction and delivery/service monitored post-launch? *
  • Are lessons learned and best practices captured for future programs? *
  • Planned launch date
  • Program manager signature *