Refinery Process Safety Management (PSM) Checklist

Audit a petroleum refinery or gas processing facility against the 14 elements of the OSHA Process Safety Management standard for highly hazardous chemicals.

OSHA 29 CFR 1910.119API RP 750API RP 754CCPS PSM

Free PDF · enter your email to download.

Process Safety Information & Employee Participation

  • Is complete written process safety information compiled covering hazards, technology, and equipment? *
  • Are safety data sheets, P&IDs, and design codes/standards documented and current? *
  • Is a written employee participation plan in place and are employees consulted on PHAs? *

Process Hazard Analysis

  • Has a PHA been performed for each covered process using an appropriate methodology (HAZOP, What-If, FMEA)? *
  • Is the PHA revalidated at least every five years? *
  • Are PHA recommendations resolved, documented, and tracked to completion? *
  • Date of the most recent PHA or revalidation. *

Operating Procedures & Training

  • Are written operating procedures maintained for each phase (startup, normal, temporary, shutdown, emergency)? *
  • Have operators received initial and refresher training on the process and procedures? *
  • Are safe work practices for hot work, lockout/tagout, and confined space entry documented and enforced? *

Mechanical Integrity & Contractors

  • Is a mechanical integrity program in place with inspection and testing schedules for critical equipment? *
  • Are equipment deficiencies corrected or managed before continued use? *
  • Are contractors evaluated for safety performance and informed of process hazards? *

Management of Change & PSSR

  • Is a management of change (MOC) procedure applied to process chemicals, technology, equipment, and procedures? *
  • Is a pre-startup safety review (PSSR) conducted for new and modified facilities? *
  • Are temporary changes tracked and returned to original design conditions or formally made permanent through MOC? *

Incident Investigation, Emergency Response & Audits

  • Are incidents that resulted in or could have resulted in a catastrophic release investigated within 48 hours? *
  • Is an emergency action plan established and coordinated with local responders? *
  • Is a compliance audit of the PSM program conducted at least every three years? *

Download the full Refinery Process Safety Management (PSM) Checklist checklist