Natural Resources Compliance 12 items
Pipeline Pigging & Inline Inspection (ILI) Checklist
Verify launch/receive safety, tool run planning, and data validation for cleaning pigs and inline inspection tools used in pipeline integrity management programs.
49 CFR 195.45249 CFR 192.493API STD 1163NACE SP0102
Free PDF · enter your email to download.
Line Preparation & Cleaning
- Has line cleanliness been established with cleaning pig runs before the inline inspection tool is run? *
- Have pipeline diameter changes, tight bends, and valve bore restrictions been verified to pass the selected tool? *
- Is a gauging or geometry pig run performed to confirm passage before the ILI tool? *
Launcher & Receiver Safety
- Is the pig trap depressurized, vented, and drained before the closure is opened? *
- Is the pressure-relieving and interlock system on the trap closure verified operational? *
- Are personnel positioned clear of the trap closure and end-cap discharge path during launch and receipt? *
Tool Run & Tracking
- Was the ILI tool type (MFL, UT, geometry) selected appropriate to the anticipated threats (metal loss, cracking, dents)? *
- Are above-ground markers and tracking used to confirm tool location and velocity during the run? *
- Was flow velocity maintained within the tool's specified operating range? *
Data Validation & Integrity Action
- Was the ILI data validated against known features and verified for adequate coverage and sensor performance? *
- Were reported anomalies assessed against remaining-strength criteria to determine repair or reinspection response? *
- Are dig verifications performed to confirm tool sizing accuracy where warranted? *
Download the full Pipeline Pigging & Inline Inspection (ILI) Checklist checklist
Get it as a clean, printable PDF — free.
