Natural Resources Compliance 14 items
Offshore Simultaneous Operations (SIMOPS) Coordination Checklist
Verify hazard identification, matrix controls, and communication protocols for simultaneous operations (drilling, production, construction, well intervention, and crane lifts) occurring concurrently on an offshore facility.
30 CFR 250 Subpart OAPI RP 2SIMAPI RP 75IADC HSE Case Guidelines
Free PDF · enter your email to download.
SIMOPS Planning & Matrix
- Has a SIMOPS matrix been developed identifying every combination of concurrent activities and whether each is permitted, restricted, or prohibited? *
- Have all interacting operations (drilling, production, well intervention, construction, diving, crane lifts) been identified with their overlapping time windows? *
- Is a bridging document in place reconciling the safety management systems of all parties and contractors involved? *
- Has a SIMOPS coordinator with defined authority been designated for the duration of the concurrent activities? *
Hazard Assessment & Controls
- Was a job hazard analysis or risk assessment completed for each simultaneous-operation interaction before work began? *
- Are ignition-source controls established to prevent hot work or crane operations near hydrocarbon-handling activities? *
- Are exclusion zones and dropped-object prevention measures defined for overlapping crane and lifting operations? *
- Have well-control barriers been verified as adequate for concurrent drilling or intervention activity? *
Communication & Coordination
- Is a dedicated communication channel and shared-frequency protocol established among all operating parties? *
- Are pre-job and shift-handover SIMOPS meetings held and documented? *
- Do all parties have stop-work authority and a clear escalation path to the SIMOPS coordinator? *
Emergency Response & Suspension
- Are the conditions that trigger suspension or de-escalation of simultaneous operations defined in advance? *
- Does the emergency response plan address the compounded hazards of concurrent operations? *
- Are muster and evacuation routes verified as unobstructed by any of the concurrent activities? *