simpl.
Natural Resources Compliance 16 items

Offshore Blowout Preventer (BOP) & Well Control Inspection

Inspect blowout preventer systems and well control equipment on an offshore rig against BSEE well control regulations.

BSEE 30 CFR 250 Subpart GAPI Standard 53

Free PDF · enter your email to download.

BOP System Configuration

  • Does the BOP stack include the required number and type of rams and annular preventers for the operation? *
  • Is the BOP equipment rated for the maximum anticipated surface pressure (MASP) of the well? *
  • Are shear rams verified capable of shearing the drill pipe in use under maximum anticipated conditions? *

Pressure Testing

  • Was a low-pressure and high-pressure test performed on the BOP system? *
  • Are BOP pressure tests conducted at intervals not exceeding 14 days? *
  • Date of the most recent BOP pressure test. *
  • Are stump tests and initial subsea tests documented before running the BOP? *

Function Testing and Response Times

  • Are BOP function tests performed at intervals not exceeding 7 days? *
  • Do the accumulator system and closing times meet the required performance criteria? *
  • Is the autoshear and deadman system function tested for subsea BOPs? *

Maintenance, Inspection and Third-Party Verification

  • Is the BOP maintained and inspected in accordance with API Standard 53 and the OEM recommendations? *
  • Has a BSEE-approved verification organization verified the BOP for deepwater operations where required? *
  • Are BOP test records, function test records, and inspection reports retained and available? *

Well Control Readiness

  • Are choke and kill lines, valves, and the diverter system inspected and functional? *
  • Is the crew's well-control certification current for personnel in well-control positions? *
  • Attach a photo of the current BOP test chart or verification record.