Steering Gear Pre-Departure Test (SOLAS V/26)

Covers the routine pre-departure testing of main and auxiliary steering gear, changeover procedures, and emergency steering under SOLAS Regulation V/26.

SOLAS Chapter VSOLAS Chapter II-1

Free PDF · enter your email to download.

Pre-Departure Testing (within 12 hours)

  • Was the steering gear tested within 12 hours before departure? *
  • Was the main steering gear operated and the rudder moved through its full travel? *
  • Was the auxiliary steering gear operated and the rudder moved through the required arc? *
  • Were the rudder angle indicators checked against the actual rudder position? *

Power Units and Monitoring

  • Were the steering gear power units and control systems, including remote control from the bridge, tested? *
  • Were the power failure and low-level alarms for the steering gear confirmed operational? *
  • Was communication between the bridge and the steering gear compartment tested? *

Changeover and Emergency Steering

  • Are simple operating instructions with a block diagram showing changeover procedures posted on the bridge and in the steering compartment? *
  • Are emergency steering drills conducted at least once every three months? *
  • Are officers and crew concerned familiar with the changeover from remote to local (emergency) steering? *

Records

  • Are the dates of the pre-departure checks and emergency steering drills recorded in the logbook? *
  • Enter the number of days since the last emergency steering drill was carried out.