simpl.
Maritime Compliance 13 items

High-Speed Craft (HSC Code) Operational Readiness

Confirms operational limits, crew qualification, and permit-to-operate conditions for high-speed craft under the 2000 HSC Code and SOLAS Chapter X.

HSC Code 2000SOLAS Chapter X

Free PDF · enter your email to download.

Certification and Permit to Operate

  • Is a valid High-Speed Craft Safety Certificate carried on board? *
  • Is a valid Permit to Operate issued by the flag or port State available and complied with? *
  • Are the operational limitations in the permit, including significant wave height and worst intended conditions, understood and observed? *

Crew Qualification and Manning

  • Do the master and officers hold type-rating training and endorsements for the specific craft? *
  • Is the crew familiar with the craft's operating compartment layout and emergency systems? *
  • Are records of route and craft familiarization current for all operating crew? *

Pre-Departure Systems Check

  • Are navigation, communication, and machinery control systems tested and functioning before departure? *
  • Is the stabilization and ride-control system operational within its limits? *
  • Are passenger seating, restraints, and safety briefings arranged for the intended service? *
  • Enter the maximum operational significant wave height permitted for the route.

Route and Environmental Limits

  • Is the craft operated only within the approved route and area of operation? *
  • Are weather forecasts obtained and confirmed within the worst intended conditions before sailing? *
  • Is a place of refuge or safe haven available within the approved operating time from any point on the route? *

Download the full High-Speed Craft (HSC Code) Operational Readiness checklist

Get it as a clean, printable PDF — free.