simpl.
Maritime Compliance 13 items

Heavy Weather and Voyage Planning Preparation

Verifies passage-plan quality and heavy-weather preparations covering appraisal, planning, execution, monitoring, and securing for adverse conditions.

SOLASIMO Res. A.893

Free PDF · enter your email to download.

Passage Plan Appraisal and Planning

  • Is a berth-to-berth passage plan prepared covering appraisal, planning, execution, and monitoring? *
  • Are charts and publications corrected to the latest notices for the intended route? *
  • Are no-go areas, under-keel clearance, and contingency/abort points identified? *
  • Are weather routeing information and forecasts obtained for the passage? *

Stability and Loading for Weather

  • Does the loading condition meet the intact stability criteria for the expected weather? *
  • Are parametric-rolling and synchronous-rolling risks assessed for the route and heading? *
  • Is the free-surface effect from slack tanks minimised before heavy weather? *

Securing for Heavy Weather

  • Are cargo, lashings, and deck equipment additionally secured before deteriorating weather? *
  • Are watertight doors, hatches, ventilators, and weathertight closures secured? *
  • Are storm rails, lifelines, and access restrictions to exposed decks put in place? *

Bridge Monitoring

  • Is the plan monitored with position fixing at appropriate intervals and speed adjusted for conditions? *
  • Is course/speed alteration considered to reduce slamming, shipping of water, and rolling? *
  • Are heavy-weather reports and any damage entered in the deck log? *

Download the full Heavy Weather and Voyage Planning Preparation checklist

Get it as a clean, printable PDF — free.