Building Permit Issuance & Inspection Checklist
Guides a building department through permit application review, required inspections, and certificate of occupancy issuance under the adopted building codes.
International Building CodeInternational Residential Code
Free PDF · enter your email to download.
Permit Application
- Is a completed permit application on file with the location, use, and scope of work described? *
- Are construction documents, including plans and specifications, submitted with the application? *
- Where required by state law, are documents prepared and sealed by a registered design professional? *
- Have permit fees been calculated and collected? *
Plan Review
- Have construction documents been reviewed for compliance with the adopted building code? *
- Has the proposed use and occupancy classification been verified? *
- Has zoning and land-use compatibility been confirmed with the planning department? *
- Have applicable flood hazard, energy, and accessibility requirements been reviewed? *
Inspections
- Are required inspections scheduled at each stage (footing/foundation, framing, rough electrical/plumbing/mechanical, and final)? *
- Is work left uncovered until the corresponding inspection is approved? *
- Are inspection results, including corrections required, documented in the permit record? *
- Are special inspections performed and reported where required by the code? *
Certificate of Occupancy
- Is a final inspection approved before the building is occupied? *
- Is a certificate of occupancy issued stating the permitted use and occupancy classification? *
- Is a temporary certificate of occupancy issued only when safe for the intended partial use? *
- Building official approval of certificate of occupancy: *