Guides a building department through permit application review, required inspections, and certificate of occupancy issuance under the adopted building codes.

International Building CodeInternational Residential Code

Free PDF · enter your email to download.

Permit Application

  • Is a completed permit application on file with the location, use, and scope of work described? *
  • Are construction documents, including plans and specifications, submitted with the application? *
  • Where required by state law, are documents prepared and sealed by a registered design professional? *
  • Have permit fees been calculated and collected? *

Plan Review

  • Have construction documents been reviewed for compliance with the adopted building code? *
  • Has the proposed use and occupancy classification been verified? *
  • Has zoning and land-use compatibility been confirmed with the planning department? *
  • Have applicable flood hazard, energy, and accessibility requirements been reviewed? *

Inspections

  • Are required inspections scheduled at each stage (footing/foundation, framing, rough electrical/plumbing/mechanical, and final)? *
  • Is work left uncovered until the corresponding inspection is approved? *
  • Are inspection results, including corrections required, documented in the permit record? *
  • Are special inspections performed and reported where required by the code? *

Certificate of Occupancy

  • Is a final inspection approved before the building is occupied? *
  • Is a certificate of occupancy issued stating the permitted use and occupancy classification? *
  • Is a temporary certificate of occupancy issued only when safe for the intended partial use? *
  • Building official approval of certificate of occupancy: *