simpl.
General / Cross-sector 13 items

Hot Work & Welding Permit (29 CFR 1910.252)

A hot work permit checklist for welding, cutting, and brazing covering fire watch, area preparation, and gas equipment safety.

29 CFR 1910.25229 CFR 1910.253NFPA 51B

Free PDF · enter your email to download.

Permit Authorization

  • Has a hot work permit been issued and authorized before work begins? *
  • Could the work be done in a designated safe area instead, avoiding the permit hazard? *
  • Permit number, location, and expiration time: *

Area Preparation

  • Are combustibles moved at least 35 feet away or protected with fire-resistant covers? *
  • Are floor and wall openings within 35 feet covered to prevent spark travel? *
  • Has the atmosphere been tested where flammable vapors could be present? *
  • Are appropriate fire extinguishers or hose lines available at the work area? *

Fire Watch & Monitoring

  • Is a trained fire watch assigned during hot work where required? *
  • Does the fire watch remain for at least 30 minutes after work is completed? *
  • Is the fire watch equipped with extinguishing equipment and trained in its use? *

Equipment & Gas Cylinders

  • Are compressed gas cylinders secured upright with valve protection caps in place? *
  • Are oxygen and fuel-gas cylinders in storage separated by 20 feet or a fire barrier? *
  • Are hoses, regulators, and cables inspected and free of damage before use? *

Download the full Hot Work & Welding Permit (29 CFR 1910.252) checklist

Get it as a clean, printable PDF — free.