Pre-Construction Mobilization Readiness Checklist

A general contractor's checklist to confirm permits, insurance, safety programs, and site logistics are in place before mobilizing crews and starting construction.

OSHA 29 CFR 1926AIA A201EPA CGP

Free PDF · enter your email to download.

Permits & Approvals

  • Is the building permit issued and posted on site? *
  • Are all trade permits (electrical, plumbing, mechanical) obtained? *
  • Is the approved permit set of drawings available on site? *
  • Is the NPDES/stormwater permit coverage in place for sites over 1 acre? *

Contracts & Insurance

  • Is the executed prime contract in place with the scope defined? *
  • Are certificates of insurance (GL, workers' comp, builder's risk) on file? *
  • Are payment and performance bonds secured where required?
  • Are subcontractor agreements and insurance verified? *

Safety Program

  • Is a site-specific safety plan and job hazard analysis complete? *
  • Is a competent person designated for required activities? *
  • Are emergency action and first-aid provisions established? *
  • Is worker safety orientation scheduled before work begins? *

Site Logistics

  • Are temporary utilities (power, water, sanitation) arranged? *
  • Is site security, fencing, and access control established? *
  • Are erosion and sediment control BMPs installed prior to disturbance? *
  • Photo of installed perimeter controls and signage

Utility & Underground Coordination

  • Has a one-call / 811 utility locate been completed before excavation? *
  • Are existing utility locations marked and documented? *
  • Pre-construction survey / dig ticket date