تفتيش البنية التحتية المدنية 17 بند
Detention/Retention Pond Inspection
قائمة التحقق هذه باللغة الإنجليزية.
Routine inspection of stormwater detention and retention (wet) ponds including embankment, outlet works, spillway, sediment storage, and vegetation.
EPA NPDES StormwaterUSACE Small Impoundment GuidanceLocal Stormwater Design Manual
PDF أو Word مجانًا · أدخل بريدك الإلكتروني للتنزيل.
Pond Information
- Pond ID / location *
- Date of inspection *
- Pond type (dry detention, wet retention, extended detention)
Embankment & Side Slopes
- Is the embankment free of erosion, rills, animal burrows, or seepage? *
- Are side slopes stable and vegetated with no slumping or bare areas? *
- Is the embankment crest free of settlement or cracking?
- Is woody vegetation absent from the embankment (per dam-safety practice)?
Outlet & Spillway
- Is the principal outlet/riser structure free of blockage, corrosion, or damage? *
- Is the trash rack/anti-vortex device intact and clear? *
- Is the emergency spillway free of erosion and obstruction? *
- Is the outfall/energy dissipator free of scour or undermining?
Sediment & Water Quality
- Is sediment accumulation below the cleanout threshold in the forebay and pond? *
- Measured sediment depth in forebay (inches)
- For wet ponds, is the permanent pool at design elevation (no drawdown/clogging)?
- Is the pond free of nuisance conditions (algae, odor, debris)?
Findings
- Were any maintenance deficiencies identified? *
- Maintenance actions recommended
نزّل قائمة تحقق Detention/Retention Pond Inspection كاملة
احصل عليها مجانًا بصيغة PDF أنيقة قابلة للطباعة أو مستند Word قابل للتعديل.
