Pre-Construction Mobilization Readiness Checklist

قائمة التحقق هذه باللغة الإنجليزية.

A general contractor's checklist to confirm permits, insurance, safety programs, and site logistics are in place before mobilizing crews and starting construction.

OSHA 29 CFR 1926AIA A201EPA CGP

PDF أو Word مجانًا · أدخل بريدك الإلكتروني للتنزيل.

Permits & Approvals

  • Is the building permit issued and posted on site? *
  • Are all trade permits (electrical, plumbing, mechanical) obtained? *
  • Is the approved permit set of drawings available on site? *
  • Is the NPDES/stormwater permit coverage in place for sites over 1 acre? *

Contracts & Insurance

  • Is the executed prime contract in place with the scope defined? *
  • Are certificates of insurance (GL, workers' comp, builder's risk) on file? *
  • Are payment and performance bonds secured where required?
  • Are subcontractor agreements and insurance verified? *

Safety Program

  • Is a site-specific safety plan and job hazard analysis complete? *
  • Is a competent person designated for required activities? *
  • Are emergency action and first-aid provisions established? *
  • Is worker safety orientation scheduled before work begins? *

Site Logistics

  • Are temporary utilities (power, water, sanitation) arranged? *
  • Is site security, fencing, and access control established? *
  • Are erosion and sediment control BMPs installed prior to disturbance? *
  • Photo of installed perimeter controls and signage

Utility & Underground Coordination

  • Has a one-call / 811 utility locate been completed before excavation? *
  • Are existing utility locations marked and documented? *
  • Pre-construction survey / dig ticket date