Crane & Rigging Lift Plan Safety Checklist
قائمة التحقق هذه باللغة الإنجليزية.
A pre-lift safety checklist for verifying crane setup, rigging, and the lift plan meet OSHA Subpart CC and ASME B30 requirements before hoisting.
OSHA 1926 Subpart CCASME B30.5ASME B30.9
PDF أو Word مجانًا · أدخل بريدك الإلكتروني للتنزيل.
Personnel & Certification
- Is the crane operator certified/qualified for the equipment type and capacity? *
- Is a qualified rigger designated for rigging tasks? *
- Is a designated signal person assigned when required? *
- Has a lift-specific toolbox talk been conducted with the crew? *
Site & Ground Conditions
- Have ground conditions been assessed as firm, drained, and adequate for the load? *
- Are outrigger/crawler pads and cribbing sized for the bearing pressure? *
- Is the minimum clearance from energized power lines maintained or de-energized? *
- Is the swing radius / danger zone barricaded? *
Equipment & Rigging Inspection
- Has a documented daily/shift inspection of the crane been completed? *
- Are slings, shackles, and below-the-hook devices inspected and within rated capacity? *
- Is the load moment / anti-two-block and safety devices functional? *
- Is the correct load chart configuration selected on the crane? *
Lift Plan Execution
- Is the load weight (including rigging) verified and within the chart capacity at radius? *
- Is this classified as a critical lift requiring an engineered/written lift plan? *
- Are wind speed limits and weather conditions within manufacturer limits? *
- Is a tag line used to control the load? *
- Lift plan reviewer signature