مركز قيادة التطوير العقاري 17 بند
Architect QA/QC & Construction Document Code Review
قائمة التحقق هذه باللغة الإنجليزية.
An in-house architect's quality control review of construction documents for coordination, code compliance, and completeness before issuing for permit or bid.
IBC 2021ADA StandardsICC A117.1IECC 2021
PDF أو Word مجانًا · أدخل بريدك الإلكتروني للتنزيل.
Drawing Coordination
- Are architectural, structural, and MEP drawings dimensionally coordinated? *
- Do plan, section, and detail references match and resolve? *
- Are wall types, ratings, and schedules consistent across sheets? *
- Are door, window, and finish schedules complete and cross-referenced? *
Code Compliance
- Is a code summary sheet included (occupancy, type, area, egress)? *
- Are occupant loads and egress calculations shown and correct? *
- Are fire-rated assemblies and penetrations detailed? *
- Is the energy compliance documentation included? *
Accessibility
- Are accessible routes, clearances, and maneuvering spaces detailed? *
- Are accessible restrooms shown with fixture/grab-bar dimensions? *
- Are counters, controls, and signage locations compliant? *
Specifications & Details
- Do specifications align with materials shown on drawings? *
- Are waterproofing, flashing, and building envelope details complete? *
- Are structural and special inspection notes coordinated with the SER? *
Issuance Readiness
- Are all sheets titled, numbered, dated, and in the index? *
- Are drawings sealed and signed by the responsible professionals? *
- Is the QA/QC reviewer sign-off recorded?
نزّل قائمة تحقق Architect QA/QC & Construction Document Code Review كاملة
احصل عليها مجانًا بصيغة PDF أنيقة قابلة للطباعة أو مستند Word قابل للتعديل.
